Building a pool deck step by step.
Setting piers and posts the floor joist frames are supported by a series of 4 x 4 posts set in the concrete pier.
Decking is again a straight forward easy part of the process that decks a long time.
The first step in building an above ground pool deck is to mark and install your support posts based on the deck design.
6 steps to build an above ground pool deck measurement and preparation building a pool deck is the kind of activity that should be conformed to your local building.
Posts installation previously marked places will equate you to keep in mind when the post should be installed.
How to build a backyard pool deck step 1.
As you install the decking boards perpendicular to the joists drive two fasteners through each board into the center of.
Deck screws down at an angle through the frame and into the tops of the posts photo 4.
Refer to the plan or use one of the assembled floor joist frames to position the pier blocks.
Once the second pair of posts is cut to size set them into the piers and place a floor joist frame on top.
Step 1 install the support posts.
It is important to remember when cutting posts to size that each one should be set at least two feet below grade.
Framing the floor the floor framing around the pool consists of 18 trapezoidal floor joist frames 4 sided.
Align the edge of the first length of decking boards with the outside edge of the beam.